Project
Balanseringcylinder lyft
PVL0239-0800
Project Data
Primary Prevas projectnumber
PVL0239-0800
Project/Visma number
PVL0239-0800
Customer
ABB Robotics
Status
historical reference
Type
lifting tool
Year
-
No Visma/Pyramid data imported yet.
Financial Overview
Totalpris från Affärsuppgörelse
-
Upparbetat tid + material
-
Ingen procentsats
Resultat mot totalpris
-
Totalpris minus upparbetat
TB1 mot totalpris
-
Totalpris saknas
Upparbetat arvode
-
Upparbetat material
-
Direkta kostnader
-
Lön -,
material -
Kalkylresultat Visma
-
Ingen marginal
Indexed Source Files
quote: 6
order: 1
document: 19
pdf: 16
declaration: 4
risk: 3
Source file index
| Type | File | Match | Status |
|---|---|---|---|
| quote | projects/PVL0239-0800_Balanseringcylinder_lyft/Offert från Lev/Offert 4987-1.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| quote | projects/PVL0239-0800_Balanseringcylinder_lyft/Offert från Lev/PVL0239-0800 Kalkyl.xlsx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| quote | projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| quote | projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| quote | projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| quote | projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| order | projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/cost_summary_simple.md | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/Bilder_till_PVL0239-0800_Bruks.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Bruks.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Bruks.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Bruks_02.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Instr.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Instr.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Instr_02.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Provlyftsprotokoll.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/delivery_docs/PVL0239-0800_Provlyftsprotokoll.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| declaration | projects/PVL0239-0800_Balanseringcylinder_lyft/other/PVL0239-0800_Declaration.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| declaration | projects/PVL0239-0800_Balanseringcylinder_lyft/other/PVL0239-0800_Forsakran.docx | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| risk | projects/PVL0239-0800_Balanseringcylinder_lyft/other/PVL0239-0800_Riskanalys.ced | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| risk | projects/PVL0239-0800_Balanseringcylinder_lyft/other/PVL0239-0800_Riskanalys.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| risk | projects/PVL0239-0800_Balanseringcylinder_lyft/other/PVL0239-0800_Riskanalys_02.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/summary.md | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/GN111-2_B.SLDASM | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/GN114.2_12x70.SLDASM | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800.SLDASM | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800.SLDDRW | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800.zip | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_02.SLDASM | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_02.SLDDRW | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_02.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_03.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| declaration | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_Declaration_01.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_Draft.PDF | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| declaration | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_Forsakran_01.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_m_660.SLDASM | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_m_760.SLDASM | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0800_m_obj.SLDASM | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0801.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0801_02.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0801_03.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0801_Draft.PDF | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/PVL0239-0899.pdf | PVL0239-0800 project token PVL0239-0800 in path |
pending | |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/Wiberger-gn111-2_skruvfaste.sldprt | PVL0239-0800 project token PVL0239-0800 in path |
pending |
| document | projects/PVL0239-0800_Balanseringcylinder_lyft/technical_scope/Wiberger-gn111-2_vajerogla.sldprt | PVL0239-0800 project token PVL0239-0800 in path |
pending |
BOM, Quotes & Ordered Costs
BOM rows
1
1 priced / 8 385 SEK
Quote/order documents
1
source files grouped from workbook evidence
Quote/order lines
1
8 385 SEK
Ordered/cost rows
1
8 385 SEK
Original tool cost
8 385 SEK
Adjusted tool price
9 056 SEK
Factor
1.080
Source
curated_abb_lyftredskap_bom: Apply 2023-to-current uplift (x1.080)
BOM components
| Component | Part | Qty | Supplier | Cost | Evidence |
|---|---|---|---|---|---|
| Material/tillverkning quote | Conrit 4987 | 1.0 st | Conrit AB | 8 385 SEK | curated ABB Lyftredskap BOM | comment: Kalkyl row: Material kostnad, Conrit 4987. | quantity_basis: Qty from material/kalkyl row; one-tool basis unless noted | link: Z:\Mälardalen\Gemensam\Projekt\02. Pågående\PVL0200-0299\PVL0239 ABB Robotivs - Lima 77XX Underam\1 - Kund\1.2 - Offert-Beställning-Avslut\PVL0239-0800\PVL0239-0800 Kalkyl.xlsx | alternative: PVL0239-0800 Kalkyl.xlsx |
Quote/order lines
| Item | Supplier | Qty | Unit | Total | Source |
|---|---|---|---|---|---|
| Material/tillverkning quote | Conrit AB | 1.0 | 8 385 | 8 385 SEK | Z:\Mälardalen\Gemensam\Projekt\02. Pågående\PVL0200-0299\PVL0239 ABB Robotivs - Lima 77XX Underam\1 - Kund\1.2 - Offert-Beställning-Avslut\PVL0239-0800\PVL0239-0800 Kalkyl.xlsx |
Candidate/evidence rows
| Component | Amount | Status | Reason | Source |
|---|---|---|---|---|
| Balanseringcylinder lyft | 239 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 1 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 3 000 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 1 993 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 2 005 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 2 023 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 1 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 3 000 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 1 993 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 2 005 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 2 023 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800_02.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 1 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 3 000 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 1 993 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 2 005 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 2 023 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Berakningsrapport_PVL0239-0800.docx |
| Balanseringcylinder lyft | 5 181 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 21 344 000 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 559 193 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 213 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 6 140 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 2 023 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 427 904 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 54 584 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 54 584 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 239 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 54 584 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 2 020 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 2 725 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 5 287 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 7 656 407 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 45 612 217 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 26 161 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 5 994 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 5 181 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 21 344 000 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 9 960 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/8601004785_20230418_214214_PurchaseOrder.pdf |
| Balanseringcylinder lyft | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 7 710 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 7 720 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 239 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 42 845 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 11 739 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 54 584 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 427 904 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.pdf |
| Balanseringcylinder lyft | 100 435 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 4 987 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 239 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 8 385 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 8 385 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 239 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 8 385 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 556 664 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 5 882 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_4987-1.pdf |
| Balanseringcylinder lyft | 38 950 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 24 600 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 3 895 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 8 385 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 4 987 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 8 385 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 32 985 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 54 584 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 3 354 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 21 599 SEK | verified | supplier quote/order price context | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 11 739 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 395 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 42 845 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 11 739 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 54 584 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/PVL0239-0800_Kalkyl.xlsx |
| Balanseringcylinder lyft | 239 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 7 710 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 7 720 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 239 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 42 845 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 11 739 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 54 584 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
| Balanseringcylinder lyft | 427 904 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0239-0800_Balanseringcylinder_lyft/commercial/Offert_PVL0239-0800.docx |
Visma/Pyramid Import
Import State
Not imported
Fetch Period
-
Visma Status
-
Report Period
-
Report Title
Balanseringcylinder lyft
Project Manager
-
Unit
-
Imported Rows
0 activities,
0 order lines,
0 purchases,
0 invoices
Project Analysis
No analysis has been generated yet.
Admin Registration
This project has not been added in Projects Admin yet.
Imported Analysis Files
No files have been imported for analysis yet.