Project
IRB2600 & IRB4600
PVL0294
Project Data
Primary Prevas projectnumber
PVL0294
Project/Visma number
PVL0294
Customer
ABB Robotics
Status
historical reference
Type
lifting tool
Year
-
No Visma/Pyramid data imported yet.
Financial Overview
Totalpris från Affärsuppgörelse
-
Upparbetat tid + material
-
Ingen procentsats
Resultat mot totalpris
-
Totalpris minus upparbetat
TB1 mot totalpris
-
Totalpris saknas
Upparbetat arvode
-
Upparbetat material
-
Direkta kostnader
-
Lön -,
material -
Kalkylresultat Visma
-
Ingen marginal
Indexed Source Files
quote: 3
order: 1
pdf: 42
document: 2
risk: 2
Source file index
| Type | File | Match | Status |
|---|---|---|---|
| quote | projects/PVL0294_IRB2600_&_IRB4600/Offert från Lev/Offert 5067-1.pdf | PVL0294 project token PVL0294 in path |
pending |
| quote | projects/PVL0294_IRB2600_&_IRB4600/Offert från Lev/PVL0294 Kalkyl.xlsx | PVL0294 project token PVL0294 in path |
pending |
| quote | projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf | PVL0294 project token PVL0294 in path |
pending |
| order | projects/PVL0294_IRB2600_&_IRB4600/Beställning to Lev/Ordererkännande 41043.pdf | PVL0294 project token PVL0294 in path |
pending |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0000_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0001_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0002_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0003_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0004_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0005_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| document | projects/PVL0294_IRB2600_&_IRB4600/cost_summary_simple.md | PVL0294 project token PVL0294 in path |
pending |
| projects/PVL0294_IRB2600_&_IRB4600/delivery_docs/PVL0294_Bruks.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/delivery_docs/PVL0294_Bruks_Rev_A.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/delivery_docs/PVL0294_Bruks_Rev_A_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/delivery_docs/PVL0294_Instr.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/delivery_docs/PVL0294_Instr_Rev_A.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/delivery_docs/PVL0294_Instr_Rev_A_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| risk | projects/PVL0294_IRB2600_&_IRB4600/other/PVL0294_Riskanalys.pdf | PVL0294 project token PVL0294 in path |
pending |
| risk | projects/PVL0294_IRB2600_&_IRB4600/other/PVL0294_Riskanalys_02.pdf | PVL0294 project token PVL0294 in path |
pending |
| document | projects/PVL0294_IRB2600_&_IRB4600/summary.md | PVL0294 project token PVL0294 in path |
pending |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0000.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0000_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0000_03.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0001.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0001_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0001_03.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0001_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0002.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0002_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0002_03.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0002_A.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0002_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0003.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0003_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0003_03.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0003_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0004.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0004_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0004_03.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0004_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0005.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0005_02.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0005_03.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0005_Draft.PDF | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0099.pdf | PVL0294 project token PVL0294 in path |
pending | |
| projects/PVL0294_IRB2600_&_IRB4600/technical_scope/PVL0294-0099_02.pdf | PVL0294 project token PVL0294 in path |
pending |
BOM, Quotes & Ordered Costs
BOM rows
2
2 priced / 11 850 SEK
Quote/order documents
1
source files grouped from workbook evidence
Quote/order lines
2
11 850 SEK
Ordered/cost rows
2
11 850 SEK
Original tool cost
11 850 SEK
Adjusted tool price
12 798 SEK
Factor
1.080
Source
curated_abb_lyftredskap_bom: Apply 2023-to-current uplift (x1.080)
BOM components
| Component | Part | Qty | Supplier | Cost | Evidence |
|---|---|---|---|---|---|
| Material/tillverkning quote | Conrit 5067/1 | 1.0 st | Conrit AB | 11 500 SEK | curated ABB Lyftredskap BOM | comment: Kalkyl row: Material kostnad, Conrit 5067/1. | quantity_basis: Qty from material/kalkyl row; one-tool basis unless noted | link: Z:\Mälardalen\Gemensam\Projekt\02. Pågående\PVL0200-0299\PVL0294 ABB Robotics - Lyftredskap för överarm IRB2600 o IRB 4600\1 - Kund\1.2 - Offert-Beställning-Avslut\PVL0294 Kalkyl.xlsx | alternative: PVL0294 Kalkyl.xlsx |
| CE-skylt | CE-skylt | 1.0 st | CE label supplier not stated | 350 SEK | curated ABB Lyftredskap BOM | comment: Kalkyl row: Ce skylt. | quantity_basis: Qty from material/kalkyl row; one-tool basis unless noted | link: Z:\Mälardalen\Gemensam\Projekt\02. Pågående\PVL0200-0299\PVL0294 ABB Robotics - Lyftredskap för överarm IRB2600 o IRB 4600\1 - Kund\1.2 - Offert-Beställning-Avslut\PVL0294 Kalkyl.xlsx | alternative: PVL0294 Kalkyl.xlsx |
Quote/order lines
| Item | Supplier | Qty | Unit | Total | Source |
|---|---|---|---|---|---|
| Material/tillverkning quote | Conrit AB | 1.0 | 11 500 | 11 500 SEK | Z:\Mälardalen\Gemensam\Projekt\02. Pågående\PVL0200-0299\PVL0294 ABB Robotics - Lyftredskap för överarm IRB2600 o IRB 4600\1 - Kund\1.2 - Offert-Beställning-Avslut\PVL0294 Kalkyl.xlsx |
| CE-skylt | CE label supplier not stated | 1.0 | 350 | 350 SEK | Z:\Mälardalen\Gemensam\Projekt\02. Pågående\PVL0200-0299\PVL0294 ABB Robotics - Lyftredskap för överarm IRB2600 o IRB 4600\1 - Kund\1.2 - Offert-Beställning-Avslut\PVL0294 Kalkyl.xlsx |
Candidate/evidence rows
| Component | Amount | Status | Reason | Source |
|---|---|---|---|---|
| IRB2600 & IRB4600 | 2 021 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll.pdf |
| IRB2600 & IRB4600 | 2 023 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll.pdf |
| IRB2600 & IRB4600 | 2 021 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll_02.pdf |
| IRB2600 & IRB4600 | 2 023 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Provlyftsprotokoll_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 1 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 2 541 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 2 018 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 2 541 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 924 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 1 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 2 005 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 2 023 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport.pdf |
| IRB2600 & IRB4600 | 294 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 1 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 2 541 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 2 018 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 2 541 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 924 SEK | candidate | numeric extraction requires manual review before import | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 1 993 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 2 005 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 2 023 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294_Berakningsrapport_02.pdf |
| IRB2600 & IRB4600 | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 294 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 35 618 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 2 600 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 4 600 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 294 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 49 163 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 16 590 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 65 753 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 2 023 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 427 904 SEK | strong | price-language context found | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/Offert_PVL0294.pdf |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0002_Draft.PDF |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0002_Draft.PDF |
| IRB2600 & IRB4600 | 2 541 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0001_Draft.PDF |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0000_Draft.PDF |
| IRB2600 & IRB4600 | 294 SEK | candidate | numeric value is near non-price engineering/document context | abb_project_database_handoff_2026-06-19/projects/PVL0294_IRB2600_&_IRB4600/commercial/PVL0294-0000_Draft.PDF |
Visma/Pyramid Import
Import State
Not imported
Fetch Period
-
Visma Status
-
Report Period
-
Report Title
IRB2600 & IRB4600
Project Manager
-
Unit
-
Imported Rows
0 activities,
0 order lines,
0 purchases,
0 invoices
Project Analysis
No analysis has been generated yet.
Admin Registration
This project has not been added in Projects Admin yet.
Imported Analysis Files